
last trench of the subdivision; power in 3 x 150 + 95 Alu

RMBT (low voltage modular connection) with the power cable in 150, a departure to another two branches in 95 RMBT customers 2x35 cables and remote reading (cable providing the connection between electronic energy meters)

the cable 150 in waiting Connection to the electrical

Box S15/S300

On the left box again (just solid) for water meters are appearing on construction sites, on the right a box S 22 electrical
Sud611@aol.com
0 comments:
Post a Comment